• dade PANEL PURE

    dade PANEL PURE

    Dade Design AG concrete works Beton

For once, we at dade design changed roles and developed an object ourselves. We set ourselves 3 challenges and learning tasks:

1. BIM testing
2. Turnkey build in 16 weeks
3. Consistent materialization in white cement. From the facade to the concrete bathtub

dade HOUSE – furnishing partner
BLUM, BORA, GESSI, THE Wall, RIBAG, RITMONIO, SCHRAMM (Bettgeschichten.ch), VIABBIZZUNO,

dade HOUSE – implementation partner*

Bär (electronics), BUCHER (wooden windows), KOST (wooden construction), Sutterlüti (sanitary), Tecton (roof), Comaking-Space (interior design), 3Plan (HKLS BIM specialist planning), Dade Development AG

1) BIM
3D planning has been standard for us for years. We wanted to find out how far BIM has come and where there are future points of contact for us.

2) ARCHITECTURE / REALIZATION IN 16 WEEKS
The task was to generate the maximum number of living space on the given roof area of 25x11m. With the Zurich building regulations (1/3 façade length, roof edge 45 degrees from 1m sill wall) and the location of the stairs and sanitary facilities, there are not many architectural options for the overall layout. The challenge therefore lay in careful detailing work. In addition, we wanted to prove in the construction management that it is possible to realize such a turnkey project in 16 weeks.

3) CONSISTENT MATERIALIZATION
Material reduction to 4 materials:
– White cement dade ROC
– wood (oak)
- Glass &
– Black matte metal

With this project, we finally wanted to create a uniform architecture reduced to 4 materials, from the facade (partner RIEDER) to the exposed concrete stairs to the concrete bathtub, which we can show interested clients in real life and not in a showroom atmosphere. You should experience the peace and power of this reduction - even we were surprised!

The core idea in the realization of two 3.5 room city apartments was the optimization of the south-north-facing living and working spaces. The bedrooms are kept relatively small, and the walls are designed as floor-to-ceiling storage spaces.

The reduction of the materials gives the object a calmness, contrasting with the hectic everyday life in the city. Only white cement was used to match the white glazed wood surfaces.

We struggled with building physics and insulation to create the highest possible room height. We ended up at 251cm which is not very much. Therefore, all interior fittings have the full room height and are butt mounted resp. baseless and mitred. The kitchens are also completely invisible thanks to the new pocket doors, which we were able to test for the first time for BLUM. All carpentry work comes from our co-making space.


NEW DADE PRODUCTS
• Purist vanity furniture dade PURE with dade ELEMENT HIS/HERS and GESSI CONO fittings
• ELINA+ washbasin furniture - cleverly produced with a mitre and ideal for combining with our 60s and 90s concrete washbasins
• Extravagant concrete bathtub dade O CUBED with GESSI INCISO fittings
• Guest bathroom with shower/toilet complete with panels and furnished in matt black by RITMONIO.
• Kitchen island dade 1004 - 1m3 concrete cube with integrated BORA and sliding/bar element
• Completely invisible kitchens, inside as a concrete kitchen with concrete fronts and push to open MIELE appliances as well as THE WALL planked with concrete panels.
• Terrace parapets with 4x4cm white cement handrail
• Windowsills with white cement inlays
• and much more…


The lighting is the secret start and comes from our partners VIABBIZZUNO and RIBAG. In particular, the KIVO light with concrete screens and the concrete light Aplomb (in white cement, of course) are used.

CO2
Our concrete manufactory has been producing CO2-neutral for 5 years. The aim of the creation and the selection of suppliers and materials was to keep the grey energy / CO2 from the construction as small as possible. We will calculate and neutralize the rest of the CO2 emissions. We are convinced that with PARIS 2050 net zero in the not-too-distant future all buildings will/must be CO2 neutral.

*Other executing companies
Aschwanden Ingenieure, Color Quelle (plasterer/painter), Egloff König (tinsmith), gE (building physics), GFT facade planning, GRIESSER (shading), K2 assembly (facade), Lawil (scaffolding), NOVA clean (construction cleaning), Möhrle & Kuhn (demolition & master builders), Renggli (timber construction planning), RIEDER (façade panels), RWD Schlatter (fire protection doors), UNIKAT (parquet), WOLF Fenster (round wooden windows)

Project Partners

Bär (Elektro), BUCHER (Holzfenster), KOST (Holzbau), Sutterlüti (Sanitär), Tecton (Dach), Timberline (Innenausbau), 3Plan (HKLS BIM Fachplanung)

  • dade Sculptures

    dade Sculptures

    Dade Design AG concrete works Beton

  • Concrete Kitchen | Design Example

    Concrete Kitchen | Design Example

    Dade Design AG concrete works Beton

  • dade CASSA 60m concrete sink

    dade CASSA 60m concrete sink

    Dade Design AG concrete works Beton

  • dade ELINA 90 washstand furniture

    dade ELINA 90 washstand furniture

    Dade Design AG concrete works Beton